Category Archives: AMEU-SALGA SSEG Resource Pack
The core set of documents required for an SSEG application process in a municipality. AMEU and SALGA endorsed.
AMEU-SALGA SSEG Requirements for Embedded Generation
Sets out what the municipality requires for SSEG to be connected to their networks, including what is and is not allowed, the standards and specifications to be complied with, and the application process to be followed. SSEG installers and customers should familiarise themselves with this document. (Updated Feb 2024)
AMEU-SALGA SSEG Application Form
This application form is to be filled in by customers / installers wishing to connect all forms of SSEG to the municipal grid. It applies to residential, commercial or industrial customers. It includes customer and site details, as well as SSEG system information necessary to assess the proposed system. (Updated Feb 2024)
AMEU-SALGA SSEG Commissioning Report
Report to be completed during the SSEG commissioning process, including checklists and sign-off by authorised personnel. (Updated Feb 2024)
Contract for connection of an embedded generator (version NOT to be signed)
Contract to be entered into by the municipality and customer regarding SSEG connection and billing arrangements. This version is designed to be made available on municipal websites or at department offices for viewing (the terms therein are agreed to by signing the SSEG Application Form, so no hardcopy contract is signed).
Contract for connection of an embedded generator (version to be signed)
Contract to be entered into by the municipality and customer regarding SSEG connection and billing arrangements. This version is designed to be used as a signed hardcopy. (Updated for Feb 2023 NRS097-2-3)
Embedded Generation Policy
A generic municipal policy document covering the overarching requirements and process of including SSEG onto the municipal network. This typically forms the primary municipal policy around SSEG and can be used for council submission. The policy document refers to the more technically detailed Requirements for Embedded Generation document, which thus forms part of the policy.
Overview of the AMEU-SALGA SSEG Resource Pack
A summary of all of the documents included in the AMEU-SALGA Resource Pack, including policies, applications forms, commissioning reports, tariff and metering guides etc (AMEU-SALGA, 2019).
AMEU-SALGA SSEG Decommissioning Report
Report to be completed on decommissioning of an SSEG system (necessary before a municipality removes the customer from the SSEG tariff)