AMEU-SALGA SSEG Requirements for Embedded Generation
Sets out what the municipality requires for SSEG to be connected to their networks, including what is and is not allowed, the standards and specifications to be complied with, and the application process to be followed. SSEG installers and customers should familiarise themselves with this document. (Updated October 2024)
October, 2024
|
All municipalities
|
3MB
|
Single Line Diagrams (SLDs) for EG, Off-grid, UPS etc systems (Compilation)
PDF file with example SLDs for a range of typical system types and configurations.
April, 2024
|
All municipalities
|
792KB
|
Single Line Diagrams for EG, off-grid, UPS etc (zip folder)
A downloadable zip folder containing ALL single line diagrams in different formats.
April, 2024
|
All municipalities
|
11 MB
|
SLD 3 PV SSEG Storage Split loads Single phase up to 20kW
April, 2024
|
All municipalities
|
420KB
|